The four-week production window runs in a specific sequence. Week one is brief lock and spine reconciliation. We take the fifteen-SKU list, the fabric specs, the colorway hex values, the drop-flight calendar and the campaign-hero direction from the founder and head of design. If the spine already exists, we reconcile the drop against it. If this is the first drop, we build the spine — roster, register, palette, composition grammar — in a five-day sprint. The founder sees roster identity previews at the end of week one and signs off before any frame is produced.
Week two is fabric contracting and hero production. Every fabric on the drop is rendered against its accuracy contract — the bonded jersey, the bonded mesh, the ribbed cotton, the silk-modal, the mulberry-silk charmeuse, the ribbed cashmere — with the founder or head of design approving the fabric-hand read against the physical garment or high-resolution reference. In parallel, the campaign hero is composed and rendered at flagship-tier — the editorial-glam frame that sets the identity for the season. The founder sees the fabric-hand approvals mid-week and the campaign hero at end of week.
Week three is the PDP suite for all fifteen SKUs. On-model hero, on-model back, on-model detail, on-model context, flat lay, construction close-up for every SKU on the archetype it was engineered for. This is the bulk of the production pass — twelve frames per SKU, one hundred and eighty frames total, all against the locked roster and the fabric contract. The founder sees SKU-by-SKU delivery through week three so any drift gets caught inside the production window.
Week four is the paid-social crop set and the wholesale linesheet layouts. Every crop is generated from the hero and PDP source frames rather than re-rendered — same roster, same register, same fabric read. The Meta 1:1, the Reels 9:16, the Pinterest 4:5, the YouTube 16:9, the link ad 1.91:1, the wholesale linesheet horizontal at 3:2. Delivered as PNG and JPG at 4K on the long edge with transparent-background variants for the flat-lay layer. Files land in the founder's Google Drive on the fourth Friday. The AW26 drop launches Oct 24 with twenty weeks of catalog runway ahead.
That is the pipeline in practice. Not theory, not decks, not sample decks. It is the same production discipline we run for adjacent apparel categories and it holds tighter at the intimates-and-loungewear register because the fabric-hand and casting arguments are more specific. The four-week window compresses to three when the spine already exists from a previous drop, and to two when only a partial capsule ships. The economics compound because the roster is already locked and the fabric contract is already priced.